Core Scientific, Inc. (CORZ) SEC Filings & Earnings Calls
EquiReason read 46 Core Scientific, Inc. SEC filings in the last 12 months. Latest: 8-K on 2026-09-10 — ERCOT conditionally approved power for three Texas data centers: Denton (297+74 MW), Pecos (300+300 MW), Hunt (431 MW). All required documentation and collateral submitted. Positiv.
Source: SEC EDGAR filings · figures as of 2026-06-30 · read by EquiReason
- Market cap
- 4.2B
- P/E TTM
- —
- Dividend yield
- —
- 52-week
- —
- Next earnings
- 5 Nov, in 12 days
Every filing, read
last 12 months · SECWhat happened, the numbers inside, guidance and risks. The original is one click away.
10 Sep 20268-K · 7.01ERCOT conditionally approved power for three Texas data centers: Denton (297+74 MW), Pecos (300+300 MW), Hunt (431 MW). All required documentation and collateral submitted. Positive regulatory milestone for capacity expansion.open
Figures in the filing · each found in the filing text
| Electrical power (Denton existing) · Denton · 2026-09-10 | $297.00 | |
| Electrical power (Denton additional) · Denton · 2026-09-10 | $74.00 | |
| Electrical power (Pecos existing) · Pecos · 2026-09-10 | $300.00 | |
| Electrical power (Pecos additional) · Pecos · 2026-09-10 | $300.00 | |
| Electrical power (Hunt planned) · Hunt · 2026-09-10 | $431.00 |
Risks flagged
Final allocation and load ramp for Pecos additional 300 MW pending conclusion of Batch Zero process.
“We will not receive the final allocation and load ramp until the conclusion of the Batch Zero process.” · word for word
14 Aug 20268-K · 7.01, 8.01Purchase price $444M; Power capacity acquired 440; Muskogee campus gross power target 1,500open
Figures in the filing · each found in the filing text
| Purchase price · point_in_time | $444M | |
| Power capacity acquired · point_in_time | $440.00 | |
| Muskogee campus gross power target · unknown | $1500.00 |
Risks flagged
Execution risk in scaling data center construction; power availability and infrastructure dependencies.
“Ability to successfully complete construction of its data centers, source sufficient electrical energy, necessary long lead infrastructure components.”
28 Jul 20268-K · 2.02, 7.01Total Customer Contracted Power 1,000; Total Customer Contracted Revenue $24.00B; Fully Diluted Market Cap $10.50Bearningsopen
Figures in the filing · each found in the filing text
| Total Customer Contracted Power · Q2-2026 | 1,000 | |
| Total Customer Contracted Revenue · Q2-2026 | $24.00B | |
| Fully Diluted Market Cap · Q2-2026 | $10.50B |
Risks flagged
Execution risk in scaling data center construction and power procurement.
“Ability to successfully complete construction of its data centers, source sufficient electrical energy, necessary long lead infrastructure components”
Dependence on customer contracts and potential for delays.
“Initial delivery for AMD is expected in early 2027; various delivery timelines” · word for word
28 Jul 20268-K · 3.02, 7.01AMD Lease Capacity 377; Neocloud Lease Capacity 152; AMD Reservation Capacity 1,925share dilutionopen
Figures in the filing · each found in the filing text
| AMD Lease Capacity · AMD · Q2-2026 | 377 | |
| Neocloud Lease Capacity · Neocloud · Q2-2026 | 152 | |
| AMD Reservation Capacity · AMD · Q2-2026 | 1,925 | |
| Warrant Shares Issued · Q2-2026 | 30,000,000 | |
| Warrant Exercise Price · Q2-2026 | $23.47 |
Risks flagged
Share dilution from warrant issuance to AMD.
“Warrant to purchase up to 30 million shares at $23.47 per share.” · word for word
Execution risk in delivering capacity on schedule.
“Initial delivery for AMD is expected in early 2027; various delivery timelines through 2028.”
28 Jul 202610-QCore Scientific announced a strategic commercial relationship with AMD for up to 2.5 GW of leasable capacity, anchored by a 15-year agreement for 530 MW, and also signed leases with a Neocloud for 152 MW.open
Figures in the filing · each found in the filing text
| Total revenue · Q2-2026 | $164M | +109% y/y |
| Colocation revenue · Colocation · Q2-2026 | $137M | +1190% y/y |
| Digital asset self-mining revenue · Digital Asset Self-Mining · Q2-2026 | $22M | -66% y/y |
| Net loss · Q2-2026 | $-1.20B | +28% y/y |
| Adjusted EBITDA · Q2-2026 | $41M | +44% y/y |
| Capital expenditures · H1-2026 | $954M | |
| Cash and cash equivalents and digital assets · 2026-06-30 | $1.80B | |
| Billable customer power capacity · Colocation · 2026-06-30 | 395 | |
| Leased customer power capacity · Colocation · 2026-06-30 | 590 | |
| Gross utility power capacity controlled · 2026-06-30 | 2,100 |
Risks flagged
Customer concentration risk
“Our colocation revenue is currently derived entirely from a single customer, CoreWeave, a provider of HPC services. For the six months ended June 30, 2026, CoreWeave represented approximately 77% of our total revenue.” · word for word
Construction and commissioning delays
“The gap between leased and billable capacity represents our primary near-term revenue growth opportunity. The pace at which we convert leased capacity to billable capacity depends on a number of factors, including equipment lead times and availability, labor constraints, permitting and interconnection sequencing, supply chain and logistical challenges, and t”
Tariff exposure on non-customer-funded projects
“capital expenditures associated with developing new data center sites, including our Hunt County, Texas campus and the Muskogee, Oklahoma site we have agreed to acquire, are not subject to the same customer-funding structure as our existing CoreWeave conversion projects. To the extent these sites require significant equipment and material procurement funded ” · word for word
Debt service and capital requirements
“Our construction capital requirements are also substantial. As of June 30, 2026, we were contractually committed to approximately $1.0 billion of future cash expenditures” · word for word
Bitcoin market exposure during transition
“During the six months ended June 30, 2026, deteriorating mining economics contributed to a $266.5 million impairment charge on mining-related assets.” · word for word
6 May 202610-QRevenue $115M (+45% y/y); Net Income (Loss) $-347M; Adjusted EBITDA $4Mopen
Figures in the filing · each found in the filing text
| Revenue · Q1-2026 | $115M | +45% y/y |
| Net Income (Loss) · Q1-2026 | $-347M | |
| Adjusted EBITDA · Q1-2026 | $4M | |
| Gross Utility Power Capacity · 2026-03-31 | $1.90B | |
| Customer Leasable Power Capacity · 2026-03-31 | $1.30B | |
| CoreWeave Contracted Capacity · 2026-03-31 | $590M | |
| Senior Secured Notes Issued · 2026-04-22 | $3.30B |
Risks flagged
Bitcoin price and network difficulty risk
“Our Digital Asset Self-Mining segment is heavily dependent on the spot price of bitcoin...Increases in network hash rate generally increase network difficulty over time, which can reduce the amount of bitcoin earned” · word for word
Impairment risk on mining equipment
“driven by $266.5 million of non-cash impairment charges on mining-related property, plant and equipment” · word for word
Tariff-related cost increases
“tariffs contributed to higher costs for certain equipment and materials procured directly by the Company for non-customer-funded projects.”
High leverage and debt maturity risk
“Term Loan Facility will mature...on March 3, 2027...$3.30 billion aggregate principal amount of 7.75% senior secured notes due 2031”
6 May 20268-K · 1.01, 1.02, 2.03, 8.01Core Scientific issued $3.3B 7.750% Senior Secured Notes due 2031, net proceeds ~$3.24B, to repay existing debt and fund reserve account.open
Risks flagged
Increased leverage from $3.3B debt issuance; interest rate 7.75%.
“Notes bear interest at 7.750% per annum, semi-annual amortization of 11.50% per annum of principal.”
6 May 20268-K · 2.02, 7.01Released earnings results and quarterly financials; issued a Regulation FD disclosure (forward guidance or material update)earningsopen
Risks flagged
Execution risk in data center construction and power sourcing.
“Ability to successfully complete construction of its data centers, source sufficient electrical energy.”
6 May 20268-K · 1.01, 7.01Core Scientific acquired 40 acres of land adjacent to its Muskogee data center for ~$421M cash, plus potential $40M earnout, to expand data center capacity with up to 440MW electricity.acquisitionopen
Risks flagged
Execution risk in closing acquisition and integrating power assets.
“Closing subject to HSR, continued effectiveness of ESAs, and Pre-Closing Reorganization.”
27 Apr 20268-K · 7.01Gross power capacity target 1.5; Leasable power target 1; Incremental power secured 300open
Figures in the filing · each found in the filing text
| Gross power capacity target · Pecos Campus | $1.50 | |
| Leasable power target · Pecos Campus | $1.00 | |
| Incremental power secured | $300.00 | |
| Land secured | $200.00 |
23 Apr 2026SC 13D/ATwo Seas Capital LP reduced its stake in Core Scientific below 5%, filing an amended Schedule 13D as a passive position.open
Figures in the filing · each found in the filing text
| Beneficial ownership percentage · 2026-04-23 | 4.4% |
Risks flagged
Activist exit / reduced conviction
“The Reporting Persons ceased to be beneficial owners of more than five percent of the Common Stock on April 23, 2026.” · word for word
23 Apr 2026SC 13D/ATwo Seas Capital LP reduced its stake in Core Scientific below 5%, filing an amended Schedule 13D as a passive position.open
Figures in the filing · each found in the filing text
| Beneficial ownership percentage · 2026-04-23 | 4.4% |
Risks flagged
Activist exit / reduced conviction
“The Reporting Persons ceased to be beneficial owners of more than five percent of the Common Stock on April 23, 2026.” · word for word
21 Apr 20268-K · 7.01Issued a Regulation FD disclosure (forward guidance or material update); filed financial statements and exhibits with this reportopen
Risks flagged
Increased leverage from proposed debt; interest rate risk.
“Notes will be senior secured obligations; use of proceeds includes repaying bridge facility.”
31 Mar 2026DEF 14AProxy statement for 2026 annual meeting, detailing executive compensation, governance changes, and business transformation to AI colocation.open
Figures in the filing · each found in the filing text
| Contracted capacity with CoreWeave · high-density colocation · 2025 | 590 | |
| Projected revenue over 12-year term · high-density colocation · 2025-2037 | $10.00B | |
| Energized megawatts · high-density colocation · 2025 | 350 | |
| Online and billing megawatts · high-density colocation · 2025 | 180 | |
| Infrastructure assets installed · high-density colocation · 2025 | $2.00B | |
| Total infrastructure investment · high-density colocation · 2025 | $5.00B | |
| Total Shareholder Return (TSR) · 2025 | 300.0% | |
| Relative TSR rank vs Russell 2000 · 2025 | 84.8% | |
| Available electrical power pipeline · 2025 | 1,500 | |
| Ideal hashrate utilization · digital asset mining · 2025 | 98.0% |
Guidance
2026 expected to be inflection point with increasing revenue visibility; contracted capacity ~590 MW; >180 MW online and billing
Management expects 2026 to be an inflection point with increasing visibility in revenue, operating profile, and new customer opportunities, supported by strong backlog and execution.
Risks flagged
Failed merger with CoreWeave
“The Merger Agreement was terminated on October 30, 2025, following Company stockholder rejection of the terms of the Merger Agreement at a special meeting of stockholders on that date.” · word for word
Accounting restatement and clawback risk
“On March 2, 2026, we restated our previously issued consolidated financial statements for the Non-Reliance Periods. As a result of this error correction the Company commenced a recovery analysis under our Clawback Policy.” · word for word
AI demand fluctuation risk
“2025 unfolded against a market backdrop, where at times, there were questions on the durability of AI demand.” · word for word
23 Mar 20268-K · 1.01, 2.03, 8.01Core Scientific increased term loan commitments by $500M to $1.0B total via an incremental amendment, borrowing the full amount on closing.open
Figures in the filing · each found in the filing text
| Term loan commitments | $1.00B |
Risks flagged
Increased leverage risk.
“Debt increased by $500M to $1.0B total.”
20 Mar 2026SC 13D/ATwo Seas Capital LP filed an amended Schedule 13D disclosing a 5.5% activist stake in Core Scientific and a waiver of a director appointment deadline.open
Figures in the filing · each found in the filing text
| Beneficial Ownership · 2026-02-26 | 5.5% |
Risks flagged
Activist-driven uncertainty
“The Funds and Accounts have delegated to TSC sole voting and investment power over the securities held by the Funds and Accounts pursuant to their respective Investment Management Agreements with TSC.” · word for word
20 Mar 2026SC 13D/ATwo Seas Capital LP filed an amended Schedule 13D disclosing a 5.5% activist stake in Core Scientific and a waiver of a director appointment deadline.open
Figures in the filing · each found in the filing text
| Beneficial Ownership · 2026-02-26 | 5.5% |
Risks flagged
Activist-driven uncertainty
“The Funds and Accounts have delegated to TSC sole voting and investment power over the securities held by the Funds and Accounts pursuant to their respective Investment Management Agreements with TSC.” · word for word
6 Mar 20268-K · 1.01, 2.03, 8.01Core Scientific enters $200M delayed-draw bridge credit agreement with Morgan Stanley Senior Fundings, Inc. as administrative agent. Increases leverage and provides liquidity.open
Risks flagged
Increased leverage from new credit agreement may strain liquidity.
“Creation of a direct financial obligation under the Credit Agreement.”
2 Mar 20268-K · 2.02, 4.02, 7.01Contracted Revenue $10.00B; Leasable Power Pipeline 1,500; Leased Power 590; Guidance: $10B+ contracted revenue, ~1.5 GW power pipelineearningsopen
Figures in the filing · each found in the filing text
| Contracted Revenue · colocation · FY2025 | $10.00B | |
| Leasable Power Pipeline · colocation · Q4-2025 | $1500.00 | |
| Leased Power · colocation · Q4-2025 | $590.00 | |
| Market Capitalization · Q4-2025 | $8.60B |
Guidance
$10B+ contracted revenue, ~1.5 GW power pipeline
Strong demand for AI colocation driving significant revenue and capacity expansion.
Risks flagged
Execution risk in scaling data center construction and securing power.
“Risks related to successfully complete construction of its data centers, source sufficient electrical energy, necessary long lead infrastructure components.”
2 Mar 202610-K/AProperty, plant and equipment overstatement $123Mopen
Figures in the filing · each found in the filing text
| Property, plant and equipment overstatement · FY2024 | $123M |
Risks flagged
Material weakness in internal controls (confirmed)
“The Company did not effectively operate controls to account for intended demolition of building and infrastructure assets... due to insufficient complement of trained personnel.”
2 Mar 202610-Q/ACore Scientific reported Q3 2025 results with total revenue down 15% YoY, self-mining revenue down 16%, and Adjusted EBITDA turning negative, while colocation revenue grew 45%.earningsopen
Figures in the filing · each found in the filing text
| Total revenue · Q3-2025 | $81M | -15% y/y |
| Digital asset self-mining revenue · Digital Asset Self-Mining · Q3-2025 | $57M | -16% y/y |
| Colocation revenue · Colocation · Q3-2025 | $15M | +45% y/y |
| Self-mining hash rate · Digital Asset Self-Mining · 2025-09-30 | $16.30 | -20% y/y |
| Bitcoin mined · Digital Asset Self-Mining · Q3-2025 | 502 | -55% y/y |
| Cash cost per bitcoin self-mined · Digital Asset Self-Mining · Q3-2025 | $79002.00 | +87% y/y |
| Gross margin · Q3-2025 | 5.0% |
Risks flagged
Merger completion risk
“The transaction is subject to the approval of the Company’s stockholders and customary closing conditions, including applicable regulatory approvals.” · word for word
Bitcoin price volatility
“Our Digital Asset Self-Mining segment is heavily dependent on the spot price of bitcoin. The prices of digital assets, specifically bitcoin, have experienced substantial volatility.” · word for word
Regulatory risk (Texas SB 6)
“Our facilities in Texas represent a significant portion of our gross power and are subject to Senate Bill 6, a statewide law enacted in June 2025 that governs large electric loads.” · word for word
Tariff risk
“Tariffs, however, could have additional material and yet unforeseen impacts on our results of operations in fiscal year 2025 and future years.” · word for word
2 Mar 202610-Q/ACore Scientific filed an amended 10-Q restating prior financials due to improper capitalization of assets committed to demolition, overstating PP&E by $127.3M.open
Figures in the filing · each found in the filing text
| Total Revenue · Q2-2025 | $79M | -44% y/y |
| Digital Asset Self-Mining Revenue · Digital Asset Self-Mining · Q2-2025 | $62M | -44% y/y |
| Colocation Revenue · Colocation · Q2-2025 | $11M | +91% y/y |
| Adjusted EBITDA · Q2-2025 | $22M | -53% y/y |
| Self-Mining Hash Rate · Digital Asset Self-Mining · Q2-2025 | $17.60 | -9% y/y |
| Bitcoin Mined · Digital Asset Self-Mining · Q2-2025 | 634 | -62% y/y |
| Average Bitcoin Price · Digital Asset Self-Mining · Q2-2025 | $98532.00 | +50% y/y |
| Cash Cost per Bitcoin Self-Mined · Digital Asset Self-Mining · Q2-2025 | $64369.00 | +115% y/y |
| Billable Power Load · Q2-2025 | $875.00 | |
| Digital Assets Held · Q2-2025 | $173M |
Risks flagged
Customer concentration in colocation segment
“Our agreement with our largest high-density colocation customer is funded almost entirely by our customer and our financial contribution is capped at a fixed dollar amount.” · word for word
Bitcoin price volatility
“Our Digital Asset Self-Mining segment is heavily dependent on the spot price of bitcoin.” · word for word
Regulatory risk from Texas SB 6
“Our facilities in Texas represent a significant portion of our gross power and are subject to Senate Bill 6...which may impact the timing, economics, or operational flexibility of our existing and future data center deployments within Texas.” · word for word
Tariff impact on equipment costs
“Tariffs, however, could have additional material and yet unforeseen impacts on our results of operations in fiscal year 2025 and future years.” · word for word
2 Mar 202610-Q/ACore Scientific filed an amended 10-Q restating prior financials due to improper capitalization of assets committed to demolition, overstating PP&E by $127.3M.open
Figures in the filing · each found in the filing text
| Total Revenue · Q2-2025 | $79M | -44% y/y |
| Digital Asset Self-Mining Revenue · Digital Asset Self-Mining · Q2-2025 | $62M | -44% y/y |
| Colocation Revenue · Colocation · Q2-2025 | $11M | +91% y/y |
| Adjusted EBITDA · Q2-2025 | $22M | -53% y/y |
| Self-Mining Hash Rate · Digital Asset Self-Mining · Q2-2025 | $17.60 | -9% y/y |
| Bitcoin Mined · Digital Asset Self-Mining · Q2-2025 | 634 | -62% y/y |
| Average Bitcoin Price · Digital Asset Self-Mining · Q2-2025 | $98532.00 | +50% y/y |
| Cash Cost per Bitcoin Self-Mined · Digital Asset Self-Mining · Q2-2025 | $64369.00 | +115% y/y |
| Billable Power Load · Q2-2025 | $875.00 | |
| Digital Assets Held · Q2-2025 | $173M |
Risks flagged
Customer concentration in colocation segment
“Our agreement with our largest high-density colocation customer is funded almost entirely by our customer and our financial contribution is capped at a fixed dollar amount.”
Bitcoin price volatility
“Our Digital Asset Self-Mining segment is heavily dependent on the spot price of bitcoin.”
Regulatory risk from Texas SB 6
“Our facilities in Texas represent a significant portion of our gross power and are subject to Senate Bill 6...which may impact the timing, economics, or operational flexibility of our existing and future data center deployments within Texas.”
Tariff impact on equipment costs
“Tariffs, however, could have additional material and yet unforeseen impacts on our results of operations in fiscal year 2025 and future years.”
2 Mar 202610-KSelf-mining hash rate 15.7 (-18% y/y); Hosted mining hash rate 2.2 (+120% y/y); Total deployed miners 151,400 (-12% y/y)open
Figures in the filing · each found in the filing text
| Self-mining hash rate · Digital Asset Self-Mining · FY2025 | $15.70 | -18% y/y |
| Hosted mining hash rate · Digital Asset Hosted Mining · FY2025 | $2.20 | +120% y/y |
| Total deployed miners · FY2025 | 151,400 | -12% y/y |
| Cash and cash equivalents · FY2024 | $836M | |
| Deferred revenue · FY2024 | $18M | +85% y/y |
| Digital asset holdings (bitcoin) · Digital Asset Self-Mining · FY2024 | 256 | |
| Gross utility power capacity · FY2025 | $1426.00 | |
| Full-time employees · FY2025 | 325 |
Risks flagged
Single customer concentration
“One customer, CoreWeave, currently accounts for 100% of our Colocation segment revenue.” · word for word
Material weakness in internal controls
“The Company did not effectively operate controls to account for intended demolition of building and infrastructure assets... due to insufficient complement of trained personnel.” · word for word
Regulatory risk from state-level data center regulation
“Texas enacted Senate Bill 6, which introduces significant new requirements for large-load electricity customers, including data centers... requires such customers to contribute to transmission interconnection costs.” · word for word
Power cost volatility
“Higher than expected power rates in 2022 materially and adversely impacted our operations.” · word for word
Transition execution risk
“Our success depends in large part on our ability to timely and successfully convert our existing facilities to support our high-density colocation customers.” · word for word
18 Feb 20268-K · 1.01, 5.02Cooperation agreement with Two Seas Capital LP; board expansion and director appointments; standstill and voting commitments; chairman not standing for re-election.open
Risks flagged
Activist involvement may lead to strategic changes; board refresh could cause short-term uncertainty.
“Cooperation agreement with standstill and voting commitments.”
30 Oct 20258-K · 7.01Total contract value with CoreWeave $10.00B; Average annual run rate revenue $850M; Existing gross power capacity 1,400open
Figures in the filing · each found in the filing text
| Total contract value with CoreWeave · Q3-2025 | $10.00B | |
| Average annual run rate revenue · Q3-2025 | $850M | |
| Existing gross power capacity · Q3-2025 | $1400.00 | |
| Client-billable power · Q3-2025 | $1000.00 | |
| Power expansion pipeline (gross) · Q3-2025 | $2300.00 | |
| Power expansion pipeline (billable) · Q3-2025 | $1500.00 |
Risks flagged
Customer concentration risk with CoreWeave; execution risk on expansion milestones.
“12-yr contracts with CoreWeave provide >$10 Billion in total contract value; joint execution risk on meeting key milestones” · word for word
Capital expenditure required for 70 MW expansion ($104M).
“Core Scientific is responsible for funding $104 Million of capex ($1.5M per MW) for the powered core and shell” · word for word
30 Oct 20258-K · 1.02, 7.01Terminated a material definitive agreement, ending a significant contract; issued a Regulation FD disclosure (forward guidance or material update)open
Risks flagged
Loss of expected merger synergies and potential strategic uncertainty
“Company will remain publicly traded; no new strategic direction announced.”
30 Oct 20258-K · 7.01Issued a Regulation FD disclosure (forward guidance or material update); filed financial statements and exhibits with this reportopen
Risks flagged
Merger failure creates strategic uncertainty and potential stock price volatility
“No alternative strategic plan disclosed; company remains independent.”
24 Oct 202510-QCore Scientific reported Q3 2025 results with total revenue down 15% YoY, colocation revenue up 45%, and a net loss of $146.7 million, while progressing on the CoreWeave merger.earningsopen
Figures in the filing · each found in the filing text
| Total revenue · Q3-2025 | $81M | -15% y/y |
| Digital asset self-mining revenue · Digital Asset Self-Mining · Q3-2025 | $57M | -16% y/y |
| Colocation revenue · Colocation · Q3-2025 | $15M | +45% y/y |
| Self-mining hash rate · Digital Asset Self-Mining · Q3-2025 | $16.30 | -20% y/y |
| Bitcoin mined · Digital Asset Self-Mining · Q3-2025 | 502 | -55% y/y |
| Cost to self-mine one bitcoin · Digital Asset Self-Mining · Q3-2025 | $79002.00 | +87% y/y |
| Net loss · Q3-2025 | $-147M |
Risks flagged
Merger execution risk
“The transaction is subject to the approval of the Company’s stockholders and customary closing conditions, including applicable regulatory approvals.” · word for word
Bitcoin price volatility
“Our Digital Asset Self-Mining segment is heavily dependent on the spot price of bitcoin.” · word for word
Regulatory risk (Texas SB 6)
“Our facilities in Texas represent a significant portion of our gross power and are subject to Senate Bill 6... which may impact the timing, economics, or operational flexibility of our existing and future data center deployments within Texas.” · word for word
Tariff risk on equipment
“Tariffs, however, could have additional material and yet unforeseen impacts on our results of operations in fiscal year 2025 and future years.” · word for word
24 Oct 20258-K · 2.02, 7.01Total revenue $81M (-15% y/y); Net loss $-147M (+68% y/y); Adjusted EBITDA $-2M (-124% y/y)earningsopen
Figures in the filing · each found in the filing text
| Total revenue · Consolidated · Q3-2025 | $81M | -15% y/y |
| Net loss · Consolidated · Q3-2025 | $-147M | +68% y/y |
| Adjusted EBITDA · Consolidated · Q3-2025 | $-2M | -124% y/y |
| Capital expenditures · Consolidated · Q3-2025 | $245M | |
| Bitcoin holdings · Consolidated · Q3-2025 | $241M |
Core Scientific, Inc. — questions
- What did Core Scientific, Inc. file recently?
- 46 SEC filings in the last 12 months. Latest: 8-K on 2026-09-10 — ERCOT conditionally approved power for three Texas data centers: Denton (297+74 MW), Pecos (300+300 MW), Hunt (431 MW). All required documentation and collateral submitted. Positive regulatory milestone for capacity expansion.
Every figure on this page comes from Core Scientific, Inc.'s own SEC filings — see them on SEC EDGAR. Price data is licensed and shown only inside the product.
How these figures are read: methodology · EquiReason.