Market data loadingS&P 500--NASDAQ--Data as of latest ETNo timestamp

Bitdeer Technologies Group (BTDR) SEC Filings & Earnings Calls

EquiReason read 43 Bitdeer Technologies Group SEC filings in the last 12 months. Latest: 6-K on 2026-10-19 — Bitdeer reports September 2026 operations: AI Cloud revenue backlog surges to ~$2.9B from $0.9B; 16-year $4.7B Tydal lease; 200% Y/Y BTC production increase to 1,355; 333.5 MW AI C.

Source: SEC EDGAR filings · figures as of 2026-06-30 · read by EquiReason

BTDRBitdeer Technologies GroupFollow BTDR — free
Software - Application · Technology
—
Price chart with a free account
Market cap
1.9B
P/E TTM
—
Dividend yield
—
52-week
—
Next earnings
16 Nov, in 23 days

Every filing, read

last 12 months · SEC

What happened, the numbers inside, guidance and risks. The original is one click away.

19 Oct 20266-KBitdeer reports September 2026 operations: AI Cloud revenue backlog surges to ~$2.9B from $0.9B; 16-year $4.7B Tydal lease; 200% Y/Y BTC production increase to 1,355; 333.5 MW AI Cloud pipeline.open

Figures in the filing · each found in the filing text

AI Cloud Revenue Backlog · AI Cloud · 2026-09$2.90B
AI Cloud ARR · AI Cloud · 2026-09$86M0% y/y
BTC Mined · Bitcoin Mining · 2026-091,355+200% y/y
Self-Mining Hash Rate · Bitcoin Mining · 2026-09$82.30
Co-Mining Hash Rate · Bitcoin Mining · 2026-09$28.70
GPU Utilization Rate · AI Cloud · 2026-0995.0%
BTC Held · Bitcoin Mining · 2026-0947
Total Proprietary Hash Rate · Bitcoin Mining · 2026-09$86.40

Risks flagged

Execution risk on large-scale data center buildout in Malaysia and Norway.

“Capacity expansion plans with delivery timelines extending to 2028.”

Bitcoin price volatility could impact mining profitability.

“BTC held decreased from 61 to 47; mining revenue sensitive to BTC price.”
Read the original on SEC EDGAR ↗
8 Oct 20266-KBoard authorized a new $100M share repurchase program effective Oct 2026-Oct 2028, fully utilizing prior $40M program.SEC ↗
2 Oct 20266-KDirector Sheldon Trainor-DeGirolamo resigned effective Oct 15, 2026; no disagreement with company operations, policies or practices.open

Risks flagged

Board composition change may signal governance shift, but no disagreement stated.

“Resignation effective Oct 15, 2026; no disagreement cited.”
Read the original on SEC EDGAR ↗
29 Sep 20266-KBitdeer Technologies Group filed a 6-K for the period ending June 30, 2026, reporting financial results with segment breakdowns including self-mining, AI cloud, and hosting. The filing includes subsequent events such as a BIT assets collateearningsopen

Risks flagged

Cryptocurrency price volatility could impact mining profitability and asset values.

“Company holds BTC and has BTC-collateralized loans, exposing it to bitcoin price fluctuations.”

Convertible debt and share repurchase programs indicate potential dilution or leverage risk.

“Multiple convertible senior notes (June 2025, November 2024, February 2026) and share repurchase programs.”

Geographic concentration in mining operations across multiple countries may expose to regulatory and operational risks.

“Operations in US, Norway, Bhutan, Ethiopia, Canada, Malaysia, Singapore, and others.”
Read the original on SEC EDGAR ↗
16 Sep 20266-KBitdeer reports August 2026 ops: AI Cloud ARR ~$86M, 100% contracted A102 facility ($800M+ revenue), 16-yr Tydal lease ($4.7B), BTC mined +249% Y/Y to 1,310. Strong AI/HPC demand conversion.open

Figures in the filing · each found in the filing text

AI Cloud ARR · AI Cloud · August 2026$86M+13% y/y
BTC Mined · Bitcoin Mining · August 20261,310+249% y/y
Self-Mining Hash Rate · Bitcoin Mining · August 2026$79.90+166% y/y
GPU Amount Deployed · AI Cloud · August 20264,328+2% y/y
Utilization Rate · AI Cloud · August 202692.0%
GPUs Under External Subscription · AI Cloud · August 20263,998+14% y/y
BTC Held · Bitcoin Mining · August 202661-76% y/y
Co-Mining Hash Rate · Bitcoin Mining · August 2026$21.60+16% y/y

Risks flagged

BTC held dropped sharply from 257 to 61, indicating significant sales or use for capex.

“BTC Held 61 (August 2026) vs 257 (July 2026)”

GPU utilization declined from 95% to 92% month-over-month, though still high.

“Utilization Rate 92% (August 2026) vs 95% (July 2026)”
Read the original on SEC EDGAR ↗
2 Sep 20266-KBitdeer acquired 200 acres near Rockdale, TX for $100M cash to develop AI/HPC infrastructure, increasing total power capacity to 3.0 GW.being acquiredopen

Figures in the filing · each found in the filing text

total power capacity · Q3-2026$3.00B
interconnected grid capacity · Q3-2026$563M
pipeline power capacity · Q3-2026$742M

Risks flagged

Development and financing risks for AI/HPC infrastructure

“forward-looking statements about development plans and power availability”
Read the original on SEC EDGAR ↗
26 Aug 20266-KForm 6-K filing for monthly production update; only cover page and signature.SEC ↗
10 Aug 20266-KTotal contract value $4.70B; IT MW contracted 121; NOI margin 90open

Figures in the filing · each found in the filing text

Total contract value$4.70B
IT MW contracted121
NOI margin90.0%
Average rate per kW/month$202.00
Remaining capex$500M
ATM equity offering size$1.00B

Risks flagged

Execution risk on construction timeline and budget for Tydal campus

“Phase 1 target commencement December 31, 2026; Phase 2 target commencement March 31, 2027; Remaining capex of approximately $500 million” · word for word

Potential equity dilution from $1B ATM program

“up to an aggregate of US$1,000,000,000 of the Class A ordinary shares” · word for word

Counterparty risk: Volta's obligations backed by LCs, but tenant has termination right at 10 years

“Tenant has a no fee termination right at 10 years; Volta's obligations are anticipated to be backed by Letters of Credit” · word for word
Read the original on SEC EDGAR ↗
10 Aug 20266-KBitdeer Q2 2026 revenue $228.8M vs $155.6M YoY, but gross loss $8.5M vs profit $12.0M, net loss $92.3M vs $62.9M. BTC mined 2,694 vs 565, hash rate 86.1 EH/s vs 30.6. AI Cloud scaling, Tydal colocation lease signed.earningsopen

Figures in the filing · each found in the filing text

Total Revenue · Q2-2026$229M+47% y/y
Gross Loss · Q2-2026$-9M-171% y/y
Net Loss · Q2-2026$-92M+47% y/y
Adjusted EBITDA · Q2-2026$31M+576% y/y
Cash, Cash Equivalents and Restricted Cash · 2026-06-30$496M
Digital Assets and Digital Assets - Receivable · 2026-06-30$197M
BTC Mined · Q2-20262,694+377% y/y
BTC Held · 2026-06-30150-90% y/y
Total Hash Rate under Management · Q2-2026$86.10+181% y/y
Self-Mining Hash Rate · Q2-2026$73.00+342% y/y

Risks flagged

Gross margin deterioration to negative territory despite revenue growth

“Gross loss of $8.5M vs prior year gross profit of $12.0M; cost of revenue grew faster than revenue”

Significant reduction in BTC held from 1,502 to 150, indicating potential sales or operational use

“BTC Held 150 vs 1,502”

Net loss widened to $92.3M from $62.9M, driven by higher costs and losses

“Net loss was US$92.3 million vs. US$62.9 million” · word for word
Read the original on SEC EDGAR ↗
5 Aug 20266-KBitdeer Technologies Group announced a $4.7 billion, 16-year colocation lease agreement for its Tydal, Norway AI data center campus with Volta, an NVIDIA Cloud Partner. The contract covers 121 IT MW, with potential total value of $8.0 billiopen

Figures in the filing · each found in the filing text

Contracted revenue (initial term) · Colocation AI Data Center · 16-year$4.70B
Potential total contract value · Colocation AI Data Center · 24-year$8.00B
IT MW contracted · Colocation AI Data Center · point_in_time$121.00
Average rate per kW/month · Colocation AI Data Center · 16-year$202.00
Revenue per IT MW per year · Colocation AI Data Center · 16-year$2M
NOI Margin · Colocation AI Data Center · point_in_time90.0%
Remaining capex · Colocation AI Data Center · point_in_time$500M
Credit backstop amount · Colocation AI Data Center · point_in_time$1.30B

Risks flagged

Lease subject to conditions precedent; not yet effective.

“Lease has not yet become effective and remains subject to satisfaction of certain conditions precedent beyond Bitdeer's control.”

Significant capex required ($500M remaining); company plans to raise debt.

“Remaining capex of approximately $500 million. Bitdeer intends to raise additional debt capital to fund ongoing infrastructure growth.”

Tenant has no-fee termination right at 10 years.

“Tenant has a no fee termination right at 10 years.” · word for word
Read the original on SEC EDGAR ↗
3 Aug 20266-KBitdeer Technologies Group reports change in certifying accountant: dismissal of MaloneBailey, LLP and appointment of Deloitte & Touche LLP, effective August 3, 2026. No disagreements or reportable events other than previously disclosed matopen

Risks flagged

Material weaknesses previously reported in FY2024 20-F; auditor change may indicate heightened scrutiny.

“Material weaknesses reported by management under Item 15 of the Company’s annual report on Form 20-F for the fiscal year ended December 31, 2024.” · word for word
Read the original on SEC EDGAR ↗
21 Jul 20266-KJune 2026 production update: Bitcoin mined up 388% Y/Y to 990 BTC; AI Cloud ARR ~$76M; new 10-year lease in Malaysia; Tydal Norway lease executed.open

Figures in the filing · each found in the filing text

BTC Mined · Crypto Mining · June 2026990+388% y/y
AI Cloud ARR · AI Cloud · June 2026$76M
Self-Mining Hash Rate · Crypto Mining · June 2026$73.00+342% y/y
Total Hash Rate under Mgmt. · Crypto Mining · June 2026$86.10+181% y/y
Self-Mining Rigs · Crypto Mining · June 2026243,000+113% y/y
GPU Utilization Rate · AI Cloud · June 202695.0%
BTC Held · Crypto Mining · June 2026150-90% y/y

Risks flagged

Legal proceedings in Clarington, OH may delay power availability.

“Timing of power availability and construction may be affected by ongoing legal proceedings filed by a neighboring company, American Heavy Plate Solutions, LLC.” · word for word

Delivery delays for key electrical components in Massillon, OH.

“Due to delivery delays for key electrical components, 21 MW is expected to be energized in phases during Q3 '26.” · word for word
Read the original on SEC EDGAR ↗
6 Jul 20266-KDirector Chao Suo resigns from board and compensation committee effective July 31, 2026, for personal reasons; no dispute or disagreement with company.open

Risks flagged

Board composition change, but no material risk given amicable departure.

“Resignation not due to any dispute or disagreement.”
Read the original on SEC EDGAR ↗
30 Jun 2026SC 13D/ATether Global Investments Fund files Amendment No. 13 to Schedule 13D, disclosing a 19.7% passive stake in Bitdeer Technologies Group.SEC ↗
30 Jun 2026SC 13D/ATether Global Investments Fund files Amendment No. 13 to Schedule 13D, disclosing a 19.7% passive stake in Bitdeer Technologies Group.SEC ↗
29 Jun 20266-KBitdeer Technologies Group announced that its subsidiary signed a colocation lease agreement for the Tydal, Norway AI data center site. The lease is not yet effective and subject to conditions precedent. No commercial terms disclosed. The copen

Risks flagged

Lease not yet effective; subject to conditions precedent beyond Bitdeer's control.

“Lease has not yet become effective and remains subject to the satisfaction of certain conditions precedent beyond Bitdeer's control. There is no assurance that such conditions will be satisfied.” · word for word
Read the original on SEC EDGAR ↗
18 Jun 20266-KMay 2026 production update: Bitcoin mined 921 (+370% Y/Y); self-mining hash rate 70.2 EH/s; AI Cloud ARR ~$69M; Tydal colocation in advanced negotiations. Strong growth in crypto mining and AI infrastructure.earningsopen

Figures in the filing · each found in the filing text

Bitcoin mined · Crypto Mining · May 2026921+370% y/y
Self-mining hash rate · Crypto Mining · May 2026$70.20
Co-mining hash rate · Crypto Mining · May 2026$10.00
Total hash rate under management · Crypto Mining · May 2026$83.10
Self-mining rigs · Crypto Mining · May 2026231,000
BTC held · Crypto Mining · May 2026171
AI Cloud ARR · AI Cloud · May 2026$69M
GPU amount deployed · AI Cloud · May 20264,248
GPU utilization rate · AI Cloud · May 202690.0%
GPUs under external subscription · AI Cloud · May 20263,305

Risks flagged

Tydal lease still in negotiation; not yet executed.

“Tydal, Norway is in advanced stages of negotiations.” · word for word

Clarington, OH project affected by legal proceedings.

“Timing of power availability and construction may be affected by ongoing legal proceedings filed by a neighboring company.” · word for word

Massillon, OH site experiencing delivery delays for electrical components.

“Due to delivery delays for key electrical components, 21 MW is expected to be energized in phases during Q3 '26.” · word for word
Read the original on SEC EDGAR ↗
16 Jun 2026SC 13D/ATether entities filed Amendment No. 12 to Schedule 13D reporting an internal transfer of Bitdeer shares with no change in aggregate beneficial ownership of 19.7%.open

Figures in the filing · each found in the filing text

Beneficial ownership percentage (Tether Global Investments Fund) · 2026-06-1219.7%
Read the original on SEC EDGAR ↗
16 Jun 2026SC 13D/ATether entities filed Amendment No. 12 to Schedule 13D reporting an internal transfer of Bitdeer shares with no change in aggregate beneficial ownership of 19.7%.open

Figures in the filing · each found in the filing text

Beneficial ownership percentage (Tether Global Investments Fund) · 2026-06-1219.7%
Read the original on SEC EDGAR ↗
8 Jun 20266-KResignation of COO Chao Suo and CBO Linghui Kong due to personal reasons; no dispute with company.open

Risks flagged

Key executives resigning could signal instability, but both remain with the company, mitigating risk.

“Resignation of COO and CBO, but they continue to serve the Company.”
Read the original on SEC EDGAR ↗
27 May 20266-KCFO Jianchun Liu resigns effective June 30, 2026 for personal reasons; Michael G. Potter appointed CFO effective May 26, 2026. Potter brings extensive CFO experience from Corsair Gaming, Canadian Solar, and semiconductor firms.open

Risks flagged

CFO resignation could cause temporary disruption, but orderly transition and experienced replacement mitigate risk.

“Mr. Liu will continue to serve as Chief Financial Officer through June 30, 2026 to ensure an orderly transition.” · word for word
Read the original on SEC EDGAR ↗
14 May 20266-KQ1 2026: Revenue $188.9M (up 169% YoY) but gross loss $39.0M, net loss $159.5M vs net profit $105.3M prior year. Adjusted EBITDA positive $14.4M. AI Cloud run-rate >$69M. 3.0 GW power portfolio.earningsopen

Figures in the filing · each found in the filing text

Total revenue · Q1-2026$189M+170% y/y
Adjusted EBITDA · Q1-2026$14M
Net loss · Q1-2026$-160M
Cash, cash equivalents and restricted cash · Q1-2026$298M
Digital assets and digital assets - receivable balance · Q1-2026$245M
Self-Mining Hash Rate · Self-Mining · Q1-2026$65.10+466% y/y
Total Hash Rate under Mgmt. · Q1-2026$78.10+223% y/y
BTC Mined · Q1-20262,033+481% y/y
BTC Held · Q1-202631-97% y/y
Average cost of electricity · Q1-2026$52.00+8% y/y

Risks flagged

Net loss widened significantly due to non-cash fair value changes; gross loss increased.

“Net loss was US$159.5 million vs. net profit of US$105.3 million.” · word for word

Crypto asset price volatility could impact digital asset values and mining profitability.

“Digital assets and digital assets - receivable balance: US$245.0 million as of March 31, 2026.” · word for word
Read the original on SEC EDGAR ↗
12 May 20266-KApril 2026 production update: Bitcoin mined 783 (+372% Y/Y), self-mining hash rate 65.5 EH/s, AI Cloud ARR ~$69M (+60% M/M). SEALMINER A4 series launched. Tydal colocation in advanced negotiations.open

Figures in the filing · each found in the filing text

BTC Mined · April 2026783+372% y/y
Self-Mining Hash Rate · Self-Mining · April 2026$65.50+428% y/y
Total Hash Rate under Mgmt. · April 2026$87.40+248% y/y
AI Cloud ARR · AI Cloud · April 2026$69M
GPU Amount Deployed · AI Cloud · April 20264,184
Utilization Rate · AI Cloud · April 202692.0%
GPUs Under External Subscription · AI Cloud · April 20263,323
BTC Held · April 202673-94% y/y

Risks flagged

BTC held decreased significantly, indicating potential sales or use as collateral.

“BTC Held 73 vs 1,246 in April 2025.”
Read the original on SEC EDGAR ↗
30 Apr 202620-FBitdeer reported FY2025 annual results: revenue surged 77% to $620.3M, swung to net profit of $65.6M from a $599.2M loss in 2024, driven by self-mining revenue growth and new mining rig sales.earningsopen

Figures in the filing · each found in the filing text

Total Net Revenue · FY2025$620M+77% y/y
Self-Mining Revenue · Self-mining · FY2025$396M+143% y/y
Adjusted EBITDA · FY2025$35M-6% y/y
Adjusted Profit/(Loss) · FY2025$-230M
Aggregate Electrical Capacity · 2026-03-31$1744.00
Proprietary Hash Rate · Self-mining · 2026-03-31$70.90
Total Hash Rate Under Management · 2026-03-31$78.10
Pipeline Capacity · 2026-03-31$1259.50
Net Income/(Loss) · FY2025$66M

Risks flagged

Bitcoin Price Volatility

“Bitcoin prices experienced significant volatility during 2024 and 2025, reaching a peak of approximately US$126,000 in October 2025 before trading at approximately US$67,000 as of March 31, 2026.” · word for word

AI Capex Sustainability Concerns

“In January 2025, the release of DeepSeek's AI model, which claimed to deliver comparable performance to leading AI systems at a fraction of the development cost, triggered a broad selloff in technology and AI infrastructure stocks, raising questions about the sustainability of AI capital expenditure levels and the competitive positioning of companies in the ” · word for word

Regulatory Uncertainty

“The effect of any regulatory change, either by federal, state, local or foreign governments or any self-regulatory agencies, on us or our potential hosting customers is impossible to predict, but such change could be substantial and may require us or our potential hosting customers to cease certain or all operations and could have a material adverse effect o” · word for word

Dilution Risk from Equity Financing

“We may issue additional Class A ordinary shares or other equity or convertible debt securities without approval of the holders of Class A ordinary shares, which would dilute existing ownership interests and may depress the market price of Class A ordinary shares.” · word for word
Read the original on SEC EDGAR ↗
20 Apr 2026SC 13D/AFounder transferred 5.5M shares for estate planning, dropping below 5% beneficial ownership.open

Risks flagged

Insider ownership reduction

“As of April 17, 2026, the Reporting Persons ceased to be the beneficial owners of more than 5% of the outstanding Class A ordinary shares of the Issuer.” · word for word
Read the original on SEC EDGAR ↗
20 Apr 2026SC 13D/AFounder transferred 5.5M shares for estate planning, dropping below 5% beneficial ownership.open

Risks flagged

Insider ownership reduction

“As of April 17, 2026, the Reporting Persons ceased to be the beneficial owners of more than 5% of the outstanding Class A ordinary shares of the Issuer.” · word for word
Read the original on SEC EDGAR ↗
15 Apr 20266-KAI Cloud ARR surged 105% MoM to ~$43M; Bitcoin production up 480% YoY; colocation negotiations for Tydal site; management expects AI cloud revenue to further accelerate.open

Figures in the filing · each found in the filing text

BTC Mined · March 2026661+480% y/y
Self-Mining Hash Rate · Self-Mining · March 2026$65.10+466% y/y
Total Hash Rate under Mgmt. · March 2026$78.10+223% y/y
AI Cloud ARR · AI Cloud · March 2026$43M
GPU Amount Deployed · AI Cloud · March 20262,128
Utilization Rate · AI Cloud · March 202694.0%
GPUs Under External Subscription · AI Cloud · March 20261,948
BTC Held · March 202631-97% y/y

Risks flagged

BTC held decreased significantly, indicating potential sales or use as collateral.

“BTC Held 31 vs 1,156 in March 2025.”
Read the original on SEC EDGAR ↗
30 Mar 20266-KBitdeer engages DCI to develop Norway's largest AI data center (180 MW) for Nvidia Vera Rubin co-location, expected completion Dec 2026. Significant capacity expansion.open

Figures in the filing · each found in the filing text

gross installed capacity · AI data center · point_in_time$180.00

Risks flagged

Project completion risk and cost overruns.

“Expected to be completed as early as December 2026” · word for word

Dependence on Nvidia Vera Rubin technology availability and adoption.

“primarily for co-location of the latest Nvidia Vera Rubin AI technology” · word for word
Read the original on SEC EDGAR ↗
16 Mar 20266-KBitdeer reports February 2026 production update: Bitcoin production up 541% YoY to 705 BTC, self-mining hashrate reaches 68 EH/s, AI Cloud ARR reaches ~$21M, and $375M convertible note offering completed.open

Figures in the filing · each found in the filing text

Bitcoin mined · self-mining · February 2026705+541% y/y
Self-mining hashrate · self-mining · February 2026$68.00
Total hash rate under management · February 2026$79.10+278% y/y
AI Cloud ARR · AI Cloud · February 2026$21M
GPU utilization rate · AI Cloud · February 202664.0%
Bitcoin held · February 202651-95% y/y

Risks flagged

Bitcoin held dropped significantly from 1,530 to 51, indicating substantial sales.

“Bitcoin held 51, down from 1,530 in January 2026”
Read the original on SEC EDGAR ↗
26 Feb 20266-KBitdeer Technologies closed $325M convertible notes offering (plus $50M greenshoe) and $43.7M equity offering. Proceeds used to repurchase $135M of existing convertible notes. Capped call transactions entered.open

Figures in the filing · each found in the filing text

Equity offering shares · point_in_time5,503,030
Existing notes repurchased · point_in_time$135M

Risks flagged

Dilution from equity offering and increased debt from convertible notes; potential pressure on stock price.

“5.5M new shares issued; $375M convertible debt added.”
Read the original on SEC EDGAR ↗
20 Feb 20266-KBitdeer priced upsized $325M convertible senior notes offering (5.00% due 2032) and registered direct offering of 5,503,030 Class A ordinary shares. Combined net proceeds ~$315M (notes) plus equity proceeds.open

Figures in the filing · each found in the filing text

Convertible Senior Notes principal amount · Q1-2026$325M
Registered Direct Offering shares · Q1-20265,503,030

Risks flagged

Potential dilution from convertible notes and equity offering.

“Convertible notes may convert into shares; registered direct offering adds shares.”
Read the original on SEC EDGAR ↗
20 Feb 2026SC 13D/ASchedule 13D/A: Tether Global Investments Fund, S.I.C.A.F., S.A. 20.1%SEC ↗
12 Feb 20266-KBitdeer reports Q4 2025 revenue of $224.8M (vs $69.0M YoY), net profit of $70.5M (vs loss of $531.9M), and positive adjusted EBITDA of $31.2M. Management highlights AI infrastructure demand and 3.0 GW power portfolio.open

Figures in the filing · each found in the filing text

Total Revenue · Q4-2025$225M+226% y/y
Net Profit · Q4-2025$71M
Adjusted EBITDA · Q4-2025$31M
Total Hash Rate Under Management · Q4-2025$71.00+229% y/y
Proprietary Hash Rate · Q4-2025$58.00+552% y/y
Self-Mining Hash Rate · Q4-2025$55.20+549% y/y
Bitcoin Mined (Self-Mining) · Q4-20251,673+257% y/y
Bitcoins Held · Q4-20252,017+240% y/y
Total Power Usage · Q4-2025$2M+175% y/y
Average Cost of Electricity · Q4-2025$46.00+12% y/y

Risks flagged

Cost of revenue grew disproportionately to $214.3M (vs $63.9M YoY), resulting in low gross margin of 4.7%

“Cost of revenue was US$214.3 million vs. US$63.9 million; Gross profit was US$10.6 million vs. US$5.1 million” · word for word

Crypto asset exposure: $218.6M in crypto and crypto receivable balance, subject to price volatility

“Crypto and crypto receivable balance: US$218.6 million as of December 31, 2025” · word for word

Significant capital requirements for 3.0 GW power portfolio buildout; pipeline capacity of 1,344 MW requires substantial investment

“Total global electrical capacity: 3,002 MW; Pipeline capacity: 1,344 MW”
Read the original on SEC EDGAR ↗
10 Feb 20266-KBitdeer reports January 2026 production update: self-mining hashrate reached 63.2 EH/s, Bitcoin production up 430% YoY to 668 BTC. Launched NVIDIA GB200 NVL72 in Malaysia, taped out Litecoin chip. GPU cloud ARR ~$10M. Total electrical capacopen

Figures in the filing · each found in the filing text

Self-mining hashrate · Self-mining · January 2026$63.20
Bitcoins mined · Self-mining · January 2026668+430% y/y
Total hash rate under management · Total · January 2026$78.10
Bitcoin held · Self-mining · January 20261,530
AI cloud ARR · AI Cloud · January 2026$10M
GPU amount deployed · AI Cloud · January 20261,792
GPU utilization rate · AI Cloud · January 202641.0%
Proprietary hash rate · Self-mining · January 2026$65.10
Mining rigs under management · Total · January 2026314,000
Self-owned mining machines · Self-mining · January 2026232,000

Risks flagged

Crypto asset price volatility and regulatory risk remain significant.

“Bitcoin held 1,530; exposure to crypto market fluctuations.”

AI cloud segment still nascent with low utilization (41%) and small ARR.

“GPU utilization rate 41%; AI cloud ARR ~$10M.”
Read the original on SEC EDGAR ↗
5 Feb 20266-KSubsidiary Erie Creek named in lawsuit over leasehold rights at Ohio industrial property; company intends to defend.open

Risks flagged

Litigation risk from leasehold dispute could lead to operational disruption or financial liability.

“AHP lawsuit seeks declaratory and injunctive relief over leasehold rights at Ohio property.”
Read the original on SEC EDGAR ↗
12 Jan 20266-KBitdeer December 2025 update: self-mining hashrate reached 55.2 EH/s; Bitcoin production up 339% YoY to 636 BTC; SEALMINER deployment accelerating; AI cloud with GB200 testing; strong operational momentum.open

Figures in the filing · each found in the filing text

Bitcoins mined (self-mining only) · self-mining · December 2025636+339% y/y
Self-mining hashrate · self-mining · December 2025$55.20
Total hash rate under management · total · December 2025$71.00
Bitcoin held · self-mining · December 20252,017
GPU Cloud ARR · AI cloud · December 2025$10M
GPU Amount Deployed · AI cloud · December 20251,152
GPU Utilization Rate · AI cloud · December 202561.0%
SEALMINER A3 Deployed · SEALMINER A3 · December 2025$5.90
SEALMINER A2 Deployed · SEALMINER A2 · December 2025$39.70
Total global electrical capacity · infrastructure · December 2025$3002.00

Risks flagged

Crypto asset beta and regulatory pressure remain key risks

“Bitcoin price volatility and regulatory changes could impact mining profitability and AI cloud demand.”

Execution risk in AI/HPC infrastructure conversion and new chip development

“SEAL04 chip development and data center conversions are in progress; delays could affect growth targets.”
Read the original on SEC EDGAR ↗
15 Dec 20256-KBitdeer provides November 2025 production and operations update: Bitcoin production up 251% YoY, self-mining hashrate reaches 45.7 EH/s, AI cloud ARR reaches ~$10M. No financial guidance.open

Figures in the filing · each found in the filing text

Self-mining hashrate · self-mining · November 2025$45.70
Bitcoin mined · self-mining · November 2025526+251% y/y
AI ARR · AI cloud · November 2025$10M
Total hash rate under management · total · November 2025$60.30
Proprietary hash rate · proprietary · November 2025$47.30
Bitcoin held · treasury · November 20252,179
GPUs deployed for cloud services · AI cloud · November 2025720
GPU utilization rate · AI cloud · November 202594.0%
External GPUs under subscription · AI cloud · November 2025609
Self-owned mining rigs · self-mining · November 2025182,000

Guidance

Expects to achieve 50 EH/s milestone by year-end 2025, with continued growth through 2026.

Management expects to reach 50 EH/s by year-end 2025 and continue growth through 2026, driven by SEALMINER deployment and AI cloud expansion.

Risks flagged

Fire incident at Massillon, Ohio site delays energization of 26 MW capacity.

“Due to a recent fire, the energization of approximately 26 MW across two affected buildings has been postponed.” · word for word

Dependence on Bitcoin price and mining difficulty; Bitcoin held as treasury asset introduces volatility.

“Bitcoin held: 2,179; Bitcoin mining revenue sensitive to price and network difficulty.”
Read the original on SEC EDGAR ↗
25 Nov 2025SC 13D/ASchedule 13D/A: Tether Holdings, S.A. de C.V. 18.2%SEC ↗
19 Nov 20256-KBitdeer Technologies Group closes a $400M convertible notes offering and a registered direct equity offering of 10.66M shares at $13.94, using proceeds to repurchase $200M of existing convertible notes.open

Figures in the filing · each found in the filing text

Convertible Senior Notes principal amount · Q4-2025$400M
Equity offering shares · Q4-202510,661,140
Existing notes repurchased principal · Q4-2025$200M

Risks flagged

Dilution from equity offering; convertible notes may dilute further upon conversion.

“10,661,140 shares issued; $400M convertible notes due 2031”

Increased leverage from new debt, though partially offset by lower coupon and longer maturity.

“$400M new debt vs $200M retired; net debt increase of $200M plus equity proceeds”
Read the original on SEC EDGAR ↗
13 Nov 20256-KBitdeer announces pricing of $400M convertible senior notes due 2031 (4.00% coupon) and a registered direct offering of 10.66M Class A shares. Proceeds to repurchase $200M of existing 2029 notes and fund capped call transactions.open

Figures in the filing · each found in the filing text

Principal amount of convertible senior notes · Q4-2025$400M
Additional notes option · Q4-2025$60M
Conversion price per share · Q4-2025$17.77
Conversion premium · Q4-202527.5%
Net proceeds from notes offering · Q4-2025$388M
Cost of capped call transactions · Q4-2025$35M
Cost of repurchasing existing notes · Q4-2025$268M
Principal amount of existing notes repurchased · Q4-2025$200M

Risks flagged

Equity dilution from registered direct offering of 10.66M shares may pressure stock price.

“Bitdeer Announces Pricing of Registered Direct Offering of 10,661,140 Class A Ordinary Shares.” · word for word

Increased leverage from $400M convertible notes, though partially offset by repurchase of existing notes.

“Pricing of US$400.0 million principal amount of 4.00% Convertible Senior Notes due 2031.” · word for word
Read the original on SEC EDGAR ↗
10 Nov 20256-KBitdeer reports October 2025 operational update: self-mining hashrate reached 41.2 EH/s, exceeding 40 EH/s target. Mined 511 Bitcoins (+13% MoM). AI cloud ARR reached $8M. SEAL04 chip testing shows 6-7 J/TH efficiency. New sites energized iopen

Figures in the filing · each found in the filing text

Self-mining hashrate · self-mining · October 2025$41.20
Bitcoins mined · self-mining · October 2025511
AI cloud ARR · HPC/AI · October 2025$8M
GPU utilization · HPC/AI · October 202587.0%
Bitcoin held · October 20252,233
Total hash rate under management · October 2025$55.50

Risks flagged

SEAL04 chip development delay could impact future efficiency and competitiveness.

“Development of next-generation SEAL04 is significantly delayed.”

Infrastructure construction and energization timelines subject to delays.

“Massillon 21 MW expected in November; remaining 200 MW by Q1 2026; Clarington targeted Q3 2026.”

Bitcoin price volatility and crypto regulatory pressure remain key risks.

“Bitcoin mining revenue sensitive to price; regulatory environment uncertain.”
Read the original on SEC EDGAR ↗
10 Nov 20256-KBitdeer Q3 2025 revenue $169.7M (+173.6% YoY), adjusted EBITDA $43.0M (vs -$7.9M prior year). Self-mining hash rate 41.2 EH/s. AI strategy accelerating with 200 MW capacity targeting $2B+ annualized revenue run-rate.open

Figures in the filing · each found in the filing text

Total revenue · Q3-2025$170M+174% y/y
Adjusted EBITDA · Q3-2025$43M
Self-mining hash rate · October 2025$41.20
Total hash rate under management · Q3-2025$49.20
Bitcoin mined (self-mining only) · Q3-20251,109
Bitcoins held · Q3-20252,029
Cash and cash equivalents · Q3-2025$196M
Crypto balance · Q3-2025$246M
Gross profit · Q3-2025$41M
Net loss · Q3-2025$-267M

Guidance

AI cloud revenue run-rate >$2B by end 2026 under optimistic scenario; self-mining hash rate exceeded 40 EH/s target.

Strong execution with revenue growth 173.6% YoY; AI cloud strategy accelerating; self-mining hash rate exceeded target; SEALMINER A3 mass production commenced.

Risks flagged

SEAL04 chip development significantly delayed, potentially impacting future ASIC competitiveness.

“Development of second-generation SEAL04 chip is significantly delayed.”

Net loss of $266.7M driven by non-cash fair value changes; crypto price volatility could impact future results.

“Net loss $266.7M includes non-cash fair value changes in cryptocurrency-settled receivables.”
Read the original on SEC EDGAR ↗
10 Nov 2025SC 13D/ASchedule 13D/A: Tether Holdings, S.A. de C.V. 18.1%SEC ↗

Bitdeer Technologies Group — questions

What did Bitdeer Technologies Group file recently?
43 SEC filings in the last 12 months. Latest: 6-K on 2026-10-19 — Bitdeer reports September 2026 operations: AI Cloud revenue backlog surges to ~$2.9B from $0.9B; 16-year $4.7B Tydal lease; 200% Y/Y BTC production increase to 1,355; 333.5 MW AI Cloud pipeline.

Every figure on this page comes from Bitdeer Technologies Group's own SEC filings — see them on SEC EDGAR. Price data is licensed and shown only inside the product.

How these figures are read: methodology · EquiReason.