Atlas Energy Solutions Inc. (AESI) SEC Filings & Earnings Calls
EquiReason read 25 Atlas Energy Solutions Inc. SEC filings in the last 12 months. Latest: 8-K on 2026-10-22 — Atlas Energy Solutions ProjectCo entered a $424M bridge loan credit agreement with Goldman Sachs and Barclays to finance power generation equipment for two data center projects, wi.
Source: SEC EDGAR filings · figures as of 2026-06-30 · read by EquiReason
- Market cap
- 1.1B
- P/E TTM
- —
- Dividend yield
- 8.7%
- 52-week
- —
- Next earnings
- 2 Nov, in 9 days
Every filing, read
last 12 months · SECWhat happened, the numbers inside, guidance and risks. The original is one click away.
22 Oct 20268-K · 1.01, 2.03, 7.01Atlas Energy Solutions ProjectCo entered a $424M bridge loan credit agreement with Goldman Sachs and Barclays to finance power generation equipment for two data center projects, with ability to request up to $286M incremental commitments.open
Risks flagged
Bridge loan has short maturity (180 days) with extension option, creating refinancing risk if long-term financing is not secured.
“The outstanding amounts under the Credit Agreement will mature 180 days after the Effective Date, subject to a one-time option to extend by 184 days upon satisfaction of certain conditions.”
Interest rate increases by 0.50% after six months, adding cost pressure if loan is extended.
“Each margin increasing by 0.50% beginning six months after the Effective Date.” · word for word
25 Sep 20268-K · 7.01, 8.01Atlas Energy Solutions enters equipment purchase agreements for 283 MW Caterpillar natural gas generation equipment, backed by cost reimbursement agreements with a leading frontier AI lab for data center projects. Also executed 328 MW purchopen
Figures in the filing · each found in the filing text
| incremental power generation capacity purchased · power generation | 283 | |
| GFA capacity purchased for 2027 · power generation · FY2027 | 328 |
Risks flagged
Execution risk on data center projects; reliance on customer commitment for cost reimbursement; long-term PPAs not yet signed.
“working together toward the execution of long-term power purchase agreements”
24 Sep 20268-K · 1.01, 8.01Atlas Energy Solutions entered two purchase agreements totaling ~$613.5M for balance-of-plant and power generation equipment for a data center project backed by a leading AI lab, indicating significant capex and AI infrastructure demand.open
Figures in the filing · each found in the filing text
| BoP Equipment Purchase Price · Power Generation · 2026-09-18 | $341M | |
| Generator Equipment Purchase Price · Power Generation · 2026-09-18 | $273M | |
| Generator Capacity · Power Generation · 2026-09-18 | 328 |
Risks flagged
Termination for convenience clause allows Shackelford to cancel with 14-day notice, but must pay cancellation costs and WMC's documented costs, introducing potential cost overrun risk.
“Shackelford may terminate the BoP Purchase Agreement as to all or any portion of the BoP Equipment for convenience upon not less than 14-day prior written notice, in which case Shackelford must pay amounts then due and WMC's documented cancellation costs and reasonable internal costs, overhead and profit attributable to work performed through termination.” · word for word
Tariff pass-through on Generator Equipment exposes company to tariff increases, with no cap mentioned.
“The purchase price includes tariffs, which are passed through at the actual amounts charged by Caterpillar Inc. and are subject to adjustment for any increase, decrease, exemption, refund or credit in the applicable tariff amounts.”
5 Aug 202610-QAtlas Energy Solutions reported Q2 2026 results with a net loss of $25.1M, adjusted EBITDA down 30.5% YoY, and a significant decline in adjusted EBITDA margin from 24.7% to 16.9%.earningsopen
Figures in the filing · each found in the filing text
| Total Revenue · Q2-2026 | $293M | +2% y/y |
| Net Loss · Q2-2026 | $-25M | +352% y/y |
| Adjusted EBITDA · Q2-2026 | $50M | -30% y/y |
| Adjusted EBITDA Margin · Q2-2026 | 16.9% | |
| Capital Expenditures · Q2-2026 | $154M | +282% y/y |
| Cash and Cash Equivalents · 2026-06-30 | $168M | +113% y/y |
| Total Debt · 2026-06-30 | $967M | +83% y/y |
| Sand & Logistics Segment Revenue · Sand & Logistics · Q2-2026 | $264M | -3% y/y |
| Power Segment Revenue · Power · Q2-2026 | $29M | +83% y/y |
| Operating Cash Flow · Q2-2026 | $-553000.00 | -101% y/y |
Risks flagged
Proppant Price Decline
“There was a decrease in proppant prices between the periods which contributed to a $19.6 million decrease in product revenue.” · word for word
High Capital Expenditure
“Capital expenditures 153,830 for Q2 2026 vs 40,268 for Q2 2025”
Litigation Costs
“Litigation settlement expense, net is $2.6 million for the three months ended June 30, 2026, as compared to no litigation settlement expense, net for the three months ended June 30, 2025, due to the Ayers litigation.” · word for word
3 Aug 20268-K · 2.02, 7.01Total revenue $293M (+2% y/y); Net loss $-25M; Adjusted EBITDA $50M (-30% y/y)earningsopen
Figures in the filing · each found in the filing text
| Total revenue · Q2-2026 | $293M | +2% y/y |
| Net loss · Q2-2026 | $-25M | |
| Adjusted EBITDA · Q2-2026 | $50M | -31% y/y |
| Adjusted Free Cash Flow · Q2-2026 | $35M | -30% y/y |
| Net cash used in operating activities · Q2-2026 | $-553000.00 | |
| Proppant product sales volumes · proppant · Q2-2026 | 5,600,000 | |
| Last Mile shipments · logistics · Q2-2026 | 6,000,000 |
Risks flagged
Net loss of $25.1M; negative operating cash flow of $553K; high capex for power division may strain liquidity.
“Net loss for the second quarter of 2026 was $25.1 million. Net cash used in operating activities of $553 thousand.” · word for word
5 May 202610-QTotal Revenue $266M (-11% y/y); Net Loss $-47M; Adjusted EBITDA $28M (-62% y/y)open
Figures in the filing · each found in the filing text
| Total Revenue · Q1-2026 | $266M | -11% y/y |
| Net Loss · Q1-2026 | $-47M | |
| Adjusted EBITDA · Q1-2026 | $28M | -62% y/y |
| Adjusted EBITDA Margin · Q1-2026 | 10.7% | |
| Capital Expenditures · Q1-2026 | $29M | -44% y/y |
| Sand & Logistics Product Revenue · Sand & Logistics · Q1-2026 | $106M | -24% y/y |
| Power Rental Revenue · Power · Q1-2026 | $18M | +139% y/y |
| Adjusted Free Cash Flow · Q1-2026 | $4M | -94% y/y |
| Net Debt · Q1-2026 | $660M | +34% y/y |
| Cash and Cash Equivalents · Q1-2026 | $40M | -42% y/y |
Risks flagged
Proppant pricing pressure
“There was a decrease in proppant prices between the periods which contributed to a $24.0 million decrease in product revenue.” · word for word
High leverage and debt service costs
“Interest expense, net increased by $3.7 million to $15.8 million for the three months ended March 31, 2026” · word for word
Execution risk on power equipment delivery
“The Company anticipates full energization during the first half of 2027, subject to customary conditions.” · word for word
4 May 20268-K · 2.02, 7.01Total revenue $266M; Net loss $-47M; Adjusted EBITDA $28M; Guidance: Targeting >550 MW deployed by H1 2027; opportunity set approaching 4 GW; 1.4 GW Caterpillar framework.earningsopen
Figures in the filing · each found in the filing text
| Total revenue · Q1-2026 | $266M | |
| Net loss · Q1-2026 | $-47M | |
| Adjusted EBITDA · Q1-2026 | $28M | |
| Net cash provided by operating activities · Q1-2026 | $19M | |
| Adjusted EBITDA Margin · Q1-2026 | 11.0% | |
| Power generation capacity target · Power · H1-2027 | $550.00 | |
| Convertible notes principal · Q1-2026 | $450M |
Guidance
Targeting >550 MW deployed by H1 2027; opportunity set approaching 4 GW; 1.4 GW Caterpillar framework.
Power business expansion with strong demand from data centers; near-term margin pressure from weather but improving; significant capex deployment funded by convertible notes.
Risks flagged
Execution risk on power generation deployment: targeting >550 MW by H1 2027 with significant capex requirements.
“Targeting more than 550 MW of power generation capacity deployed through the first half of 2027; opportunity set approaching 4 GW.” · word for word
Near-term margin pressure from weather-related plant operating costs; expected improvement but uncertain.
“First quarter results were impacted by higher plant operating costs following severe winter weather; expect improved plant operating costs in the second quarter.” · word for word
Commodity macro sensitivity: oilfield activity disruption from winter weather impacted results.
“Following severe winter weather in January that disrupted West Texas oilfield activity.” · word for word
9 Apr 20268-K · 1.01, 2.03, 3.02, 8.01Issued $450M 0.50% convertible senior notes due 2031, including $60M greenshoe; proceeds used for general corporate purposes; conversion premium ~30%.open
Figures in the filing · each found in the filing text
| Convertible Senior Notes principal amount · Q2-2026 | $450M | |
| Conversion price per share · Q2-2026 | $14.51 | |
| Coupon rate · Q2-2026 | 0.5% |
Risks flagged
Potential dilution from convertible notes conversion
“initial conversion rate is 68.9275 shares per $1,000 principal; conversion price ~$14.51” · word for word
Debt service obligation with low coupon but eventual principal repayment risk
“Notes are senior unsecured obligations; interest payable semi-annually; maturity 2031”
6 Apr 20268-K · 2.02, 7.01, 8.01Convertible notes principal $300M; Greenshoe option $45M; Master Lease repayment $66Mearningsopen
Figures in the filing · each found in the filing text
| Convertible notes principal | $300M | |
| Greenshoe option | $45M | |
| Master Lease repayment | $66M | |
| ABL credit facility repayment | $75M |
Risks flagged
Convertible notes create potential dilution if converted, though capped calls mitigate
“capped call transactions are expected generally to reduce the potential dilution to the Company’s Common Stock upon any conversion of the notes” · word for word
Debt refinancing reduces near-term liquidity risk but increases leverage
“repay outstanding advances under its Master Lease Agreement... repay outstanding borrowings under its 2023 ABL Credit Facility” · word for word
1 Apr 20268-K · 2.02, 7.01, 8.01Adjusted EBITDA guidance Q2 2026 $50M; Sand sales volume Q1 2026 5,800,000; Third-party sand purchased 150,000; Guidance: Q1 Adjusted EBITDA $26-30M vs prior guidance of flat vs Q4 (which was ~$50M)earningsopen
Figures in the filing · each found in the filing text
| Adjusted EBITDA guidance Q2 2026 · Q2-2026 | $50M | |
| Sand sales volume Q1 2026 · sand · Q1-2026 | 5,800,000 | |
| Third-party sand purchased · sand · Q1-2026 | 150,000 | |
| Power PPA capacity · power | 120 | |
| Incremental power Adjusted EBITDA · power · FY2026 | $35M |
Guidance
Q1 Adjusted EBITDA $26-30M vs prior guidance of flat vs Q4 (which was ~$50M)
Q1 guidance cut due to weather and maintenance disruptions, but Q2 outlook strong with demand acceleration and power segment growth
Risks flagged
Winter weather disruption and maintenance costs impacted Q1 production and margins
“severe winter weather in January that disrupted West Texas oilfield activity... incremental maintenance projects... temporarily elevated maintenance spending constrained production and sales inventory” · word for word
Third-party sand purchases and trucking/diesel cost spikes negatively impacted Q1 margins
“required to purchase approximately 150 thousand tons of third-party sand... temporary spike in third-party trucking rates and a late-quarter increase in diesel prices” · word for word
Power segment still nascent; PPA revenue not expected until H1 2027
“commissioning and energization to take place in first half of 2027” · word for word
27 Mar 2026DEF 14AAdjusted Free Cash Flow $153M; Net Income (Loss) $-50Mopen
Figures in the filing · each found in the filing text
| Adjusted Free Cash Flow · FY2025 | $153M | |
| Net Income (Loss) · FY2025 | $-50M |
Risks flagged
Negative Net Income
“Net Income (Loss) ($)(in thousands) ... 2025 ... (50,304)”
Low STI Payout
“The Compensation Committee determined to assign a total payout of 45% for our 2025 performance.” · word for word
Pledging of Shares by Insiders
“All of the shares of Common Stock held directly by Anne and Bud Vested are pledged as security... All of the shares of Common Stock held directly by 3 Dog Interests, LP are pledged as security.” · word for word
10 Mar 20268-K · 1.01, 7.01Atlas Energy Solutions entered a Global Framework Agreement with Caterpillar for ~1.4 GW of power generation equipment with a minimum purchase obligation of ~$840M through 2030, including annual capacity deposits and price escalations cappeopen
Figures in the filing · each found in the filing text
| Reserved Capacity · point_in_time | $1.40 | |
| Total Aggregate Purchase Obligation · point_in_time | $840M | |
| Annual Capacity Deposit · point_in_time | $5M |
Risks flagged
Execution risk: purchase obligations may be subject to tariff adjustments and annual escalations capped at 8%.
“The initial purchase price for the Equipment is subject to adjustments including annual escalations capped at 8% per year, shipping and transportation and adjustments for tariffs effecting the cost of the Equipment.” · word for word
24 Feb 202610-KAverage price per ton $21.00 (-17% y/y); Average price per ton $25.26 (-41% y/y); Average price per ton $42.63open
Figures in the filing · each found in the filing text
| Average price per ton · product · FY2025 | $21.00 | -17% y/y |
| Average price per ton · product · FY2024 | $25.26 | -41% y/y |
| Average price per ton · product · FY2023 | $42.63 | |
| Borrowing availability under ABL Credit Facility · 2026-02-24 | $68M | |
| Deferred Cash Consideration Note outstanding principal · 2025-12-31 | $10M | |
| Power generation equipment lease commitment · power · 2025-12-26 | $385M | |
| Dividend per share (base) · Q1-2025 | $0.25 |
Risks flagged
Proppant oversupply and pricing pressure
“If proppant is oversupplied, our customers may not be willing to enter into long-term take-or-pay contracts, may demand lower prices or both, which would have an adverse effect on our business, results of operations and financial condition.” · word for word
Concentration in Permian Basin
“Currently, a majority of our operations are geographically concentrated in the Permian Basin. As a result, we may be disproportionately exposed to various factors...” · word for word
Autonomous trucking technology development risk
“Our autonomous trucking technology is based on an artificial intelligence (“AI”) software platform... There can be no assurances that our technology partner will be able to meet the technological requirements...” · word for word
High leverage and debt covenant risk
“Our debt agreements contain a number of significant covenants that may limit our ability to... If we violate any of the restrictions or covenants... a significant portion of our indebtedness may become immediately due and payable...” · word for word
Loss of tax benefits from Up-C Simplification
“Foregoing these potential cash tax savings attributable to the Up-C structure will likely to increase our tax liability materially, and such increased tax liability could significantly outweigh the anticipated benefits of the Up-C Simplification...” · word for word
23 Feb 20268-K · 2.02, 7.01Revenue $1.10B (+4% y/y); Net income (loss) $-50M; Adjusted EBITDA $222M (-23% y/y)earningsopen
Figures in the filing · each found in the filing text
| Revenue · FY2025 | $1.10B | +4% y/y |
| Net income (loss) · FY2025 | $-50M | |
| Adjusted EBITDA · FY2025 | $222M | -23% y/y |
| Total volumes · FY2025 | 21,600,000 | |
| Revenue · Q4-2025 | $249M | |
| Net income (loss) · Q4-2025 | $-22M | |
| Adjusted EBITDA · Q4-2025 | $37M | |
| Total liquidity · Q4-2025 | $109M | |
| Cash and cash equivalents · Q4-2025 | $41M | |
| Availability under ABL · Q4-2025 | $68M |
Risks flagged
Net loss and declining Adjusted EBITDA indicate operational and cost pressures.
“Net loss of ($50.3) million vs net income of $59.9 million in prior year; Adjusted EBITDA fell to $221.7M from $288.9M”
30 Dec 20258-K · 1.01, 2.03Power generation equipment capacity 240; Lease facility amount $385Mopen
Figures in the filing · each found in the filing text
| Power generation equipment capacity · Galt Power Solutions | 240 | |
| Lease facility amount | $385M |
Risks flagged
Increased financial obligations from lease and guarantee; interest rate exposure (SOFR + 635 bps).
“Lease rate factor equal to 1-Month SOFR plus 635 basis points; Company guarantees obligations.”
4 Nov 202510-QTotal revenue $260M (-15% y/y); Product revenue $107M (-26% y/y); Adjusted EBITDA $40M (-43% y/y)open
Figures in the filing · each found in the filing text
| Total revenue · Q3-2025 | $260M | -15% y/y |
| Product revenue · Product · Q3-2025 | $107M | -27% y/y |
| Adjusted EBITDA · Q3-2025 | $40M | -43% y/y |
| Adjusted EBITDA Margin · Q3-2025 | 15.5% | |
| Net income (loss) · Q3-2025 | $-24M | |
| Operating cash flow · Q3-2025 | $32M | -62% y/y |
| Free cash flow (Adjusted Free Cash Flow) · Q3-2025 | $22M | -63% y/y |
| Debt, net · 2025-09-30 | $554M | +34% y/y |
| Rental revenue · Rental · Q3-2025 | $17M |
Guidance
Management notes modest decline in drilling activity due to oil price weakness and OPEC+ supply, but sees long-term demand from data centers and AI. No explicit guidance provided.
Risks flagged
Oil price and demand sensitivity
“Despite commodity price fluctuations due to ongoing uncertainties in geopolitics, OPEC+ production hikes, and tariffs, amongst other factors, North American drilling and completion activity experienced a modest decline during the period.” · word for word
Tariff-driven cost inflation
“As a result of the current administration’s trade policy, tariffs may increase our and our customers’ raw material input costs.” · word for word
High leverage and interest expense
“Interest expense, net increased by $3.8 million to $15.0 million for the three months ended September 30, 2025, as compared to $11.2 million for the three months ended September 30, 2024.” · word for word
Customer concentration and credit risk
“Credit loss expense is $4.2 million for the nine months ended September 30, 2025, as compared to de minimis credit loss expense for the nine months ended September 30, 2024, due to certain shortfall receivables.” · word for word
3 Nov 20258-K · 7.01Power generation capacity target 400; Power generation equipment order 240open
Figures in the filing · each found in the filing text
| Power generation capacity target · power · early 2027 | $400.00 | |
| Power generation equipment order · power · Q4-2025 | $240.00 |
Risks flagged
Execution risk on equipment delivery and deployment timeline
“equipment is scheduled to be delivered in late 2026”
3 Nov 20258-K · 2.02, 7.01Total revenue $260M (-15% y/y); Net income (loss) $-24M; Adjusted EBITDA $40M (-43% y/y); Guidance: Q4 2025 Adjusted EBITDA projected lower sequentiallyearningsopen
Figures in the filing · each found in the filing text
| Total revenue · Q3-2025 | $260M | -15% y/y |
| Net income (loss) · Q3-2025 | $-24M | |
| Adjusted EBITDA · Q3-2025 | $40M | -43% y/y |
| Adjusted EBITDA Margin · Q3-2025 | 15.0% | |
| Net cash provided by operating activities · Q3-2025 | $32M | -62% y/y |
| Adjusted Free Cash Flow · Q3-2025 | $22M | -63% y/y |
| Product revenue · Sand & Logistics · Q3-2025 | $107M | |
| Service revenue · Sand & Logistics · Q3-2025 | $136M | |
| Rental revenue · Sand & Logistics · Q3-2025 | $17M | |
| Cash and cash equivalents · Q3-2025 | $41M |
Guidance
Q4 2025 Adjusted EBITDA projected lower sequentially
Q4 guidance for lower Adj. EBITDA sequentially; volumes for Sand & Logistics forecasted lower; power business capex increasing.
Risks flagged
Weak completions market and lower customer demand driving revenue decline.
“softer than expected customer demand” · word for word
Higher operating costs at Kermit facility due to dredge feed and wet plant issues.
“higher operating costs at Kermit due to issues with the dredge feed and the wet plant” · word for word
Dividend suspension signals balance sheet strain and prioritization of growth capex.
“Suspending the dividend was a deliberate choice to safeguard our balance sheet’s long-term strength” · word for word
Atlas Energy Solutions Inc. — questions
- What did Atlas Energy Solutions Inc. file recently?
- 25 SEC filings in the last 12 months. Latest: 8-K on 2026-10-22 — Atlas Energy Solutions ProjectCo entered a $424M bridge loan credit agreement with Goldman Sachs and Barclays to finance power generation equipment for two data center projects, with ability to request up to $286M incremental commitments.
Every figure on this page comes from Atlas Energy Solutions Inc.'s own SEC filings — see them on SEC EDGAR. Price data is licensed and shown only inside the product.
How these figures are read: methodology · EquiReason.